|
It was the jib's time, actually. |
For Canadian sailors on the Great Lakes, October can be a sad time. The same weather that brings exciting sailing in the form of cool, windy days great for long trips also heralds the five months of the year (here inland at Toronto at least; it's different on the east and west coasts) that our boats are, generally, cradled on land. Decommissioning, which involves at our club demasting, is a fair bit of work and preparation to avoid damage or even injury (our mast may be 200 kilos to judge by the grunting five adults make to get it off the dolly and into a rack).
|
The naked foretriangle is shocking! |
This year, however, is (I certainly hope) the last year we'll be in Toronto for some time, and we are crowding the boat with all sorts of spares and tools we've previously kept in a garage or a related storage space. Making room for
every sail we intend to bring has involved a fair bit of planning. And there will be more to come.
I was able on a relatively light air day to take off the yankee-cut jib by myself and to bag it and the staysail in the forepeak. The mainsail removal required Mrs.
Alchemy, as the day selected was very breezy (20-28 knots) and only the favourable WNW wind direction that made "head to wind" at dock over the deck, more or less, allowed a reasonably crisis-free stripping and folding away. No pictures, alas...I'm sure it was dramatic from shore!
|
The pensive Mrs. Alchemy did not, evidently, fancy being in this shot. |
Because I need to prep the inward-turning pilothouse flange to restore its roof, I needed to have a look-see. I want to clean up this flange and put a wide strip of HDPE plus butyl tape for sealing purposes all the way around to separate the steel from the aluminum prior to bolting it down; the bolts will have coatings and nylon bushings to keep them from reacting electrically with roof or hull. The roof, although it's aluminum, is a well-built, heavy thing, so I rigged the boom to work with the topping lift to hoist it up.
|
Needs a clean, but the two-part's intact. |
Unfortunately, the imminence of the haulout this coming weekend means I may have to wait until the spring in order to finish this job (paint not kicking well in mid-winter), as without the boom, I would either have to rig a gantry to lift the roof or, as has been the case in the past, find four men willing to lift the thing gently to one side
or to find a Polecat crane.
|
That "polished" part is where the old fluxgate compass sat, and where the new heading sensor will go. |
One outstanding task is to regasket the pilothouse roof's opening hatches. Both drip a bit in the rain, and as a stop-gap, I've taped them up.
|
The sharp-eyed will note I went from the straps to the line. More secure. |
Lastly, I brought down the Honda 2 to sit on its designated workshop mount. One-armed lifting and shifting is a beautiful thing. Tomorrow, the mast comes out.
|
There's a newer 2.3 HP Honda, but I'm not tempted. An air-cooled, 15 kg. 3.5 HP? Perhaps. |
No comments:
Post a Comment