|
A magnet, some line and a boathook hauled this out of the lake after six months. Cleaned up nicely, no? |
As the departure date approaches, and, as the last post suggested, the paying work has more or less ceased, boat work has taken on a near-daily rhythm. I say "near" because there are still calls on my time for peripheral concerns, like our out-of-town rental property.
|
My brother-in-law tacking down the flashing on the roof vent on the last day of March. It's been a fairly harsh spring. |
The day before our new tenants were to move in, the next-door neighbours contacted us and said "I think the flashing coming off your roof and is maybe letting snow and rain in."
Talk about motivation.
Myself and my brother-in-law skedaddled eastward, drill sets and fasteners in hand. As it turns out, the flashing was actually aluminum soffit lengths under a wooden, full-length "cap" over a roof vent. Water couldn't actually get in, but we repaired it nonetheless as I wanted to make things right for the new tenants, who are now settling in.
|
They look heavy, and weigh more. |
Meanwhile, back on the still-cradled boat (circa the start of April), I had to remove the six L-16 batteries in order to access the standpipe, which brings water from the outside of the hull to, respectively, the raw-water cooling side of the engine, the head, the air-conditioning/heat pump circuit, and, in the near-future,
the watermaker we hope to install in Halifax.
|
Note the relatively short threads on the nipples. |
I discussed after haulout last fall with Andrew Barlow, pal and fabricator/welder extraordinaire, the possibility of replicating the
original standpipe of
Alchemy in favour of something a) in stainless steel and b) threaded in
NPS to take
Marelon or equivalent ball valves, as we did with the galley and head sink drains.
|
Creative carving was required in order to access the various sides of the standpipe. This is inside the galley cabinetry. |
Andrew indicated he was up for the job, despite the tricksy time he had in the past getting the NPS threaded nipples cut on a lathe. Despite the fact that NPS, which needs
pipe dope or
Teflon tape (or both) to be sealed as it is not sealed via a tapering thread, is quite common, apparently you need to know some kind of handshake to have a set of NPS dies.
|
Four really expensive valves, one pipe. Behold the logic of "fewer holes in boat, happier skipper". |
The two leading manufacturers of plastic-type (as opposed to metal) ball valves are U.S.-based Forespar and
New Zealand-made TruDesign, the latter being the newer entry in this rather rarefied field of yacht plumbing. The rationale is that plastic valves neither corrode nor are subject to galvanic corrosion, evidence of which I found in the replaced drain nipples and in the old standpipe. Both had bronze ball valves on mild steel nipples.
|
The dry fitting is a good way to see if you're going to have problems. The Tru-Designs went on precisely. |
I opted for TruDesign because last year's Marelon ball valves leaked slightly and spun on with some reluctance. We were able to get them to work, but the 3/4" I.D. ball valves I obtained from Defender Marine seemed to bind in the NPS threads. A phone call to Forespar confirmed that they used "only NPS", which was the whole reason I had to go that route in the first place. Nonetheless, I did not feel confident about such a mission-critical component (all the water-inlet nipples are well below the waterline, of course) making me anxious, so I got four TruDesign ball valves.
|
Occasionally, I plot my next moves on the foredeck when hauled out. Visionary requires visions. |
I now have spares. That's OK. With water tankage and a water maker to come, I'll use them.
|
Sparky! |
Having cleared the space, cut the needed access, and assured sufficient power, I watched as Andrew wielded his grinder in the tight quarter. Apparently, yoga keeps him flexible.
|
Further inspection of the old standpipe suggested replacement to avoid failure was a "sooner rather than later" situation. |
The hole left down in the hull was interesting because it's the smallest possible amount of wood I could remove to allow Andrew room sufficient to weld the new standpipe in place. Those black hoses are fuel lines from the forward and aft keel tanks. This whole area is usually beneath the batteries and (of late) companionway stairs.
|
The abyss. |
The sight of Andrew welding a structural "doubler" on the outside of the hull was...interesting.
|
Not seen: A fire extinguisher at the ready |
Of note is the positive shut-off. When working on the batteries, I typically turn off the charger at the panel, the main switch and both the positive and negative disconnects.
|
That area, once completed, was painted by Mrs. Alchemy |
The welding went well, I thought. By "well", I mean "we didn't sink when launched".
|
It's warm work down there. |
I had to cut a little notch for the lowest nipple (the engine raw-water inlet). No biggie: I have a useful
Fein Multimaster knock-off I've brutalized for years. Still works and cost me $99!
|
Note the depth of the threads. I wanted maximum contact. |
The picture shows the nipple covered in Teflon tape. I also used pipe dope, aka "joint compound" or "pipe paste". I use it sparingly and it coats the threads both on the valve and the nipple. Absent the sort of gasket a garden hose possesses (probably the most common object the average person would encounter an NPS thread), the combo seems to do the trick.
|
I had to orient the handles in different directions and mountings to allow them to work in this proximity. |
Spoiler alert: Not a drop.
|
Smooth operation. When we haul in Halifax, I'll have it ground down smoother. |
This was a big and backbreaking project, but I'm happy we did it. No amount of softwood bungs would do the trick if a pipe nipple crumbled at sea.